PavingDundee
1970s detached house back garden with rectangle marked with string and pegs, barrow and slabs on pallets.
1970s detached house back garden, rectangle marked with string and pegs

Paving installation
in Dundee

Here is how a paving job runs, in the order it happens.

  • Levels and drainage set out before digging
  • A compacted base, built in layers
  • Joints filled and the site left clean
  • Levels and fall set out first
  • Dug out to firm ground
  • Base compacted in layers
  • Joints filled and site swept
  • Call now to plan your job
Victorian terrace front garden on a slope with pegs and string for a path and level step, tape on the grass.

Step one: measure, mark out and decide the fall

Before a spade goes in, we walk the site: the house wall, damp-proof course, drains, gate widths and slope. Then we mark out and decide where the water goes.

  • Dimensions, levels and gate widths checked
  • The fall, and where the water goes
  • Surface height set under the damp-proof line
1960s semi back garden with mini-digger lifting soil, bulk bag beside it, compacted stone in one corner.

Step two: dig, then build the base

The dig goes deep enough for the base and surface. A soft or wet spot is dug deeper and filled with stone, and each layer is compacted before the next.

  • Soil and old paving removed
  • Crushed stone placed and compacted, layer by layer
  • Checked for level and fall before laying starts
1950s semi back garden with buff slabs being laid on a bed with a brush and bucket of jointing sand beside the finished edge.

Step three: lay, joint and tidy

Slabs are set on a bed and tapped to level, and blocks go on screeded sand and are compacted. Edges are held firm, joints filled and the surface swept.

  • Edges restrained so nothing creeps
  • Joints filled and the surface swept
  • Tools, waste and off-cuts taken away
Mixed 1930s semi and stone villa street with front gardens, a lowered kerb and a paved front path along the street.

Sort these before the digger arrives

  • Council. Conservation areas and listed buildings need the council's say first. Dundee has 17 conservation areas.
  • Kerb. A new drive across the pavement needs the council's consent first. See block paving.
  • Access. Tell us if the barrow goes through the house, up steps or along a narrow lane.

Paving installation questions

What should I check with the council before work starts?

Dundee City Council has 17 conservation areas and says permitted development limits are lower in them, and that a listed building needs consent for exterior changes (council pages, read 24 November 2026). A new drive across the pavement needs the council's consent first (Dundee City Council vehicular access page, read 24 November 2026). Paving at the front, between house and road, should be porous or drain onto porous ground (Planning Circular 1/2024, Class 3C, read 24 November 2026). A shared green or a rented home also needs the owner's agreement.

How many days will the job take?

It turns on the size, the ground and the weather. We give a realistic time after we have seen the garden.

Will you cart away the old slabs and soil?

Yes, as part of the dig, if you want it included. Ask for it in the quote.

Is it noisy and messy?

Digging and compacting are noisy for a day or so, and there will be soil and stone in the garden. We keep the site tidy and sweep up at the end.

Can you get a barrow down a narrow path or lane?

Usually. Tell us the narrowest point, because it changes how much labour the job needs.

What if it rains?

Wet weather can hold up laying.

What is the next step?

Ring us on 01382 915053, or put your postcode in the contact form.

Ask for a quote

Put in your postcode and say what the job is.

A star means the box must be filled. A phone number and postcode let us place the job.

Your details are used to answer you. The privacy page says more.

If the form does not send, please call.

Get a quote01382 915053Call now